Power Up with REVCO Insights Blog

Entries tagged [#pressurecontrol]

The Importance of Choosing the Right Control Station


Posted on Wednesday Jan 22, 2025 at 06:44PM in Educational Resources


Bad control stations cost uptime. This field-ready guide explains how to choose NEMA 3R vs 4/4X for coastal sites, size contacts and control transformers with quick math, wire to NEC 2023, and avoid common traps like mixing Class 2 with power or treating a station as a disconnect. Read more to speed installs, cut callbacks, and pass inspection the first time.


Read More