Why it matters

Power costs are not getting kinder on Long Island. Every wasted watt becomes heat, noise, and a future callback. Using energy-efficient transformers cuts no-load and load losses, trims operating bills, and helps meet current rules without repainting the job twice. Start by standardizing on efficient, listed units sized for today’s loads and tomorrow’s growth. If you need a quick starting point, browse Revco’s transformers and accessories.

Fundamentals

  • No-load vs load losses. Core steel soaks up power even at light load. That is no-load loss. Winding I^2R loss rises with current. High-efficiency cores and lower resistance windings attack both.
  • Temperature rise. Common ratings are 150, 115, or 80 degree Celsius rise. Lower rise usually means higher efficiency and longer insulation life. It also helps in tight mechanical rooms.
  • Harmonics and K-factor. Drives, LED power supplies, and servers inject harmonics. A K-rated transformer uses beefed-up conductors and design tweaks to survive the extra heating. Survey nonlinear loads before you order.
  • Dry-type vs liquid-filled. Dry-type units are common indoors and in schools, offices, and multifamily cores. Liquid-filled units shine outdoors and at higher kVA. For a refresher, see Revco’s dry-type vs oil-filled overview.
  • Sound. NEMA ST 20 gives typical sound level expectations. Quieter units reduce complaints in corridors and tenant spaces.

Code & compliance (NEC 2023 + federal)

  • NEC Article 450. Use it for transformer installation rules. See 450.3 for overcurrent protection, 450.9 for ventilation, 450.10 for grounding and bonding, 450.11 for marking, and 450.13 for location.
  • Working space and listing. Follow 110.26 for clearances and 110.3(B) for installing per the listing and instructions.
  • Separately derived systems. If the secondary is not solidly connected to a primary grounded conductor, apply 250.30 for grounding and bonding. Check 250.20 for system grounding identification.
  • Efficiency rules. DOE 10 CFR 431 sets minimum efficiency for distribution transformers. Specify compliant units to avoid costly replacements.
  • Product standards. Look for listing to UL 1561 for dry-type general-purpose power transformers, and use NEMA ST 20 as a performance guide.
  • Local AHJ. Nassau and Suffolk jurisdictions may adopt local amendments or interpretations. Always confirm with the AHJ before inspection scheduling.

Selection steps

  1. Define loads and duty cycle. Sum continuous and noncontinuous loads. Note nonlinear gear like VFDs, elevators, UPS, and LED drivers. If harmonics are significant, specify a K-rated unit.
  2. Choose primary and secondary voltages. Common pick: 480 to 208Y/120. For lighting or controls, you may need 277 to 120 or 240 to 120. If you only need a small adjustment, consider a buck-boost unit.
  3. Pick kVA. Calculate full-load current, apply sensible headroom for growth, then check nameplate temperature rise and efficiency. Avoid oversizing that pushes you into wasteful no-load loss.
  4. Select enclosure and location. Indoors uses ventilated NEMA 1, outdoors NEMA 3R or better. Verify clear, ventilated placement per 450.9 and 110.26. For tenant spaces, favor low-sound designs.
  5. Decide on taps and impedance. Primary taps help correct utility voltage. Typical impedance in the 3 to 6 percent range limits fault current and helps coordination. Match taps to measured service voltage.
  6. Specify compliance and documentation. Call out DOE 10 CFR 431 compliance, UL 1561 listing, NEMA ST 20 guidance, and the exact NEC articles used for installation. File cut sheets and test data for the AHJ.

For special projects, you may also need control transformers for panels or machinery. Revco stocks dedicated control and power-supply transformers to keep your gear supported end-to-end.

Sizing & configuration examples

Example A: 75 kVA, 480 V to 208Y/120 V dry-type

Secondary full-load current: I_sec = kVA ÷ (sqrt(3) × V_L-L) = 75,000 VA ÷ (1.732 × 208 V) = 75,000 ÷ 360.3 = 208 A (rounded).

Primary full-load current: I_pri = 75,000 ÷ (1.732 × 480) = 75,000 ÷ 831.4 = 90.2 A.

  • Coordinate overcurrent protection using NEC 450.3 and 240; follow the nameplate and the listing per 110.3(B).
  • Grounding and bonding for a separately derived system per 250.30; identify system grounding per 250.20.
  • Place the unit where ventilation meets 450.9 and working space meets 110.26.

Need a refresher on these builds? See Revco’s distribution transformer guide.

Example B: Correct 208 V to about 230 V with a buck-boost

Target: From 208 V supply to ~230 V load. Required boost ≈ 230 − 208 = 22 V.

Many buck-boost units have 12/24 V secondaries. Wire for a 24 V boost: V_out ≈ 208 + 24 = 232 V, typically acceptable for equipment that expects 230 V. Confirm the equipment tolerance and the wiring diagram.

VA sizing rule for the buck-boost secondary: VA ≈ load current × boost volts.

Example: 30 A load; 22–24 V boost → VA ≈ 30 × 24 = 720 VA. Choose the next standard size above that rating. Browse Revco’s buck-boost transformer options.

Installation & wiring notes

  • Mount solid and level; add vibration isolation where noise matters. Follow the enclosure’s required clearances and airflow per 450.9.
  • Verify tap settings before energizing. Match taps to measured primary voltage.
  • Treat the secondary as a separately derived system when applicable; bond and ground per 250.30 with the grounding electrode conductor sized correctly.
  • Label the system per 450.11. Keep working space clear per 110.26.
  • For outdoor placements, use suitable enclosures and provide drip loops. Protect conductors from physical damage.

For landscape and architectural loads, Revco stocks low-voltage lighting transformers.

Testing, commissioning, documentation

  • Pre-energization: verify nameplate, taps, torque, insulation clearances, and grounding. Confirm conductor sizes and OCPD selection.
  • Energize at no load; check noise and temperature. Then load gradually and record primary and secondary voltages.
  • After the first heavy-load day, perform a thermal check and re-torque if the manufacturer allows it.
  • File cut sheets, test data, and as-built notes for the AHJ. Keep them with the O&M package.

See Revco’s practical extend transformer life tips.

Troubleshooting

  • Overheating: check load level, harmonics, ventilation, and tap settings. Consider K-rated designs if nonlinear loads are heavy.
  • Excessive noise: confirm mounting and isolation; compare to NEMA ST 20 sound expectations.
  • Low secondary voltage: recheck taps and conductor voltage drop; use a buck-boost if the service is consistently low.
  • Nuisance trips: verify impedance and coordination; revisit 450.3 and 240 for OCPD limits.

Also see Revco’s common transformer installation mistakes.

Common mistakes

  • Oversizing a unit so far that no-load losses dominate at light load.
  • Ignoring harmonics; skipping K-factor when drives and LED supplies are everywhere.
  • Wrong enclosure for the environment.
  • Missing working clearances or ventilation rules.
  • Incorrect bonding of a separately derived system.

Parts to stock

Shop at Revco for transformer solutions and accessories.

When to call the AHJ or an engineer

  • Vaults or high kVA in tight buildings; NEC 450 Part III may apply.
  • Heavy nonlinear loads or selective coordination concerns.
  • Parallel transformers, unusual voltages, or life-safety systems.
  • Local amendments in Nassau or Suffolk County; verify before inspection.

Safety disclaimer

Follow the equipment listing and instructions, NEC 2023, and local amendments. Only qualified persons should install or service transformers. When guidance conflicts, the AHJ has the final say.

FAQ

  • Do high-efficiency units always run cooler? Often yes, because lower losses reduce heat, but verify the temperature rise rating on the nameplate.
  • Is K-rating the same as efficiency? No. K-rating addresses harmonic heating tolerance; efficiency addresses losses at rated test points.
  • Can I step up as well as step down? Many distribution transformers can; check the tap range and wiring diagram.
  • How do I confirm DOE compliance? Specify distribution transformers that meet 10 CFR 431 Subpart K and keep the manufacturer’s efficiency data.

Author: Revco Editorial Team - Electrical Content Editor
Technical review: Pending — add approved name/credential
Contact: (631) 283-3600

About Revco Lighting & Electrical Supply

Since 1978, Revco Lighting & Electrical Supply has been helping professionals bring their projects to light—literally. As a go-to source for lighting and electrical products across Long Island, NY and nearby areas, we specialize in supporting contractors, builders, and industry experts with practical solutions and dependable service. Whether it’s a complex commercial build or a simple residential upgrade, we’re here to make sure you have what you need, when you need it.

Sources

  1. DOE, “10 CFR Part 431 Subpart K — Distribution Transformers,” eCFR, retrieved Aug 2025. eCFR.
  2. NEMA, “ST 20-2021 Dry Type Transformers for General Applications,” retrieved Aug 2025. NEMA ST 20.
  3. UL, “UL 1561 — Dry-Type General Purpose and Power Transformers,” retrieved Aug 2025. UL 1561.
  4. NFPA, “NFPA 70, National Electrical Code,” retrieved Aug 2025. NFPA 70.

energy efficient transformers